攪拌機(jī)運(yùn)行時(shí)需要注意哪些地方?
來源:http://www.wishnailspa.com/日期:2020-08-06
概述: 混凝土攪拌機(jī)的正常運(yùn)行是每個(gè)用戶都想看到的,這就要求用戶在使用攪拌機(jī)時(shí)要注意以下三個(gè)環(huán)節(jié): Every user wants to see the
混凝土攪拌機(jī)的正常運(yùn)行是每個(gè)用戶都想看到的,這就要求用戶在使用攪拌機(jī)時(shí)要注意以下三個(gè)環(huán)節(jié):
Every user wants to see the normal operation of concrete mixer, which requires users to pay attention to the following three links when using the mixer:
1.攪拌機(jī)運(yùn)行前:混凝土攪拌機(jī)運(yùn)行前后,傳動(dòng)機(jī)構(gòu)、工作裝置、制動(dòng)器等。應(yīng)進(jìn)行可靠的檢查和緊固,以確保正常運(yùn)行。大齒圈、皮帶輪等部件上應(yīng)安裝防護(hù)罩,攪拌筒、支撐傳動(dòng)和運(yùn)動(dòng)部件以及倉門、斗門和軌道內(nèi)不得有異物卡住。
1. Before mixer operation: before and after concrete mixer operation, transmission mechanism, working device, brake, etc. Reliable inspection and fastening shall be carried out to ensure normal operation. Protective cover shall be installed on the big gear ring, belt pulley and other parts. There shall be no foreign matters stuck in the mixing drum, supporting transmission and moving parts, bin door, bucket door and track.
2.混合器正在運(yùn)行:
2. Mixer running:
(1)進(jìn)料時(shí),嚴(yán)禁將頭或手伸入料斗和機(jī)架,操作時(shí)不得用手或工具等東西伸入攪拌筒扒料卸料。
(1) When feeding, it is strictly forbidden to put the head or hand into the hopper and rack, and do not use hands or tools to reach into the mixing drum to pick up and discharge materials.
(2)料斗上升時(shí),禁止在料斗下工作或行走。料坑底部應(yīng)為料斗提供一個(gè)枕頭,在清理料坑時(shí),料斗應(yīng)使用鏈條固定。
(2) When the hopper rises, it is forbidden to work or walk under the hopper. A pillow shall be provided for the hopper at the bottom of the pit, and the hopper shall be fixed by chain when cleaning the pit.
(3)向攪拌筒加料應(yīng)在運(yùn)行中進(jìn)行;添加新材料只能在攪拌機(jī)中所有的原混凝土卸載后進(jìn)行。除反向卸料外,不要中途停止攪拌機(jī)或在攪拌機(jī)滿載時(shí)啟動(dòng)攪拌機(jī)。
(3) The charging of the mixing drum shall be carried out in operation; the addition of new materials can only be carried out after all the raw concrete in the mixer has been unloaded. Do not stop the mixer midway or start the mixer when the mixer is fully loaded, except for reverse discharge.
(4)作業(yè)時(shí),如故障不能繼續(xù)運(yùn)行,應(yīng)立即切斷電源,將攪拌筒內(nèi)的混凝土清理干凈。
(4) During operation, in case of failure, the power supply shall be cut off immediately and the concrete in the mixing drum shall be cleaned up.
3.攪拌機(jī)運(yùn)轉(zhuǎn)后:當(dāng)混凝土攪拌完成或預(yù)計(jì)停止1小時(shí)以上時(shí),除了排出剩余的材料外,還應(yīng)將石頭和清水倒入振動(dòng)桶中,并打開攪拌機(jī),將附著在桶上的砂漿清洗干凈后排出。桶內(nèi)不得有積水,以防桶和葉片生銹。同時(shí),還應(yīng)清理攪拌筒外積聚的灰塵,以保持機(jī)器的清潔和完好。
3. After the mixer is running: when the concrete mixing is completed or it is expected to stop for more than 1 hour, in addition to discharging the remaining materials, stones and water should also be poured into the vibrating bucket, and the mixer should be opened to clean the mortar attached to the barrel before discharging. There should be no water in the barrel to prevent the barrel and blades from rusting. At the same time, the dust accumulated outside the mixing drum should be cleaned to keep the machine clean and intact.
The above is about the concrete mixer operation need to pay attention to the relevant matters, hope to help you, want to learn more, welcome to click our http://www.wishnailspa.com Official website.