日日夜夜天天,亚洲av永久无码精品放毛片,熟女少妇丰满一区二区,狠狠人妻777

歡迎您訪問萊州聚峰機械有限公司網(wǎng)站!
點擊撥打服務熱線:400-879-1999
大家都在搜: 四驅(qū)越野叉車 四驅(qū)越野叉車B 四驅(qū)越野叉車A

如何提高多功能攪拌機軌道的效率?

來源:http://www.wishnailspa.com/日期:2021-03-18

概述:如何提高多功能混凝土攪拌機軌道的效率?How to improve the efficiency of multifunctional concrete mixer track?正確使用設備
如何提高多功能混凝土攪拌機軌道的效率?
How to improve the efficiency of multifunctional concrete mixer track?
正確使用設備齊全的攪拌機可以促進施工并提高運營效率。正確使用機械零件會損壞設備并縮短其使用壽命。主要操作是嚴格按照說明進行操作。通常,如果夏天攪拌機軌道溫度太高,則應立即停止攪拌并降低溫度,然后再進行操作。
The correct use of fully equipped mixer can promote the construction and improve the operation efficiency. Correct use of mechanical parts will damage the equipment and shorten its service life. The main operation is in strict accordance with the instructions. Generally, if the mixer track temperature is too high in summer, the mixing should be stopped immediately and the temperature should be reduced before operation.
1.在操作內(nèi)置混合器時,液壓系統(tǒng)的壓力必須符合說明,并且不得隨意調(diào)節(jié)。液壓油的質(zhì)量和數(shù)量必須符合原始要求。
1. When operating the built-in mixer, the pressure of the hydraulic system must comply with the instructions and must not be adjusted at will. The quality and quantity of hydraulic oil must meet the original requirements.
2.在運行獨立式混合器之前,請注意混合罐中剩余水和碎屑的填充和排放。在運輸過程中,需要連續(xù)滾動以防止混凝土偏析。在混凝土攪拌機到達施工現(xiàn)場并卸下之前,攪拌機必須以14-18 rpm的全速旋轉(zhuǎn)1-2分鐘,然后旋轉(zhuǎn)并卸下?;旌贤氨仨毾韧V谷缓蟠蜷_,然后才能旋轉(zhuǎn)。
2. Before running the stand-alone mixer, please pay attention to the filling and discharging of the remaining water and debris in the mixing tank. During transportation, continuous rolling is required to prevent concrete segregation. Before the concrete mixer arrives at the construction site and is unloaded, the mixer must rotate at a full speed of 14-18 rpm for 1-2 minutes, and then rotate and unload. The mixing drum must be stopped and then opened before it can be rotated.
3.環(huán)境溫度不超過+ 25°C,從裝卸到卸貨的連續(xù)時間不超過60分鐘,環(huán)境溫度不低于+ 25°C,并且上述時間超過90分鐘。不可以。
3. The ambient temperature shall not exceed + 25 ° C, the continuous time from loading and unloading to unloading shall not exceed 60 minutes, the ambient temperature shall not be lower than + 25 ° C, and the above time shall exceed 90 minutes. may not.
              混凝土攪拌機
4.在冬季施工期間,在開始工作之前,請確保冰已降落。下班后,小心地排干攪拌碗和供水系統(tǒng)中的剩余水,關(guān)閉泵的開關(guān),并將控制手柄置于“停止”位置。
4. During winter construction, please make sure that the ice has fallen before starting work. After work, carefully drain the remaining water in the mixing bowl and water supply system, turn off the switch of the pump, and put the control handle in the "stop" position.
5.在施工現(xiàn)場卸貨后,有必要使用設備上附帶的軟管沖洗料斗,卸料斗,卸料斜槽等,以去除附著在車身上的淤泥和混凝土。在返回攪拌站的途中,應將150-200升水倒入攪拌槽中,以清潔攪拌槽壁和葉片上的混凝土殘渣。
5. After unloading at the construction site, it is necessary to use the hose attached to the equipment to flush the hopper, discharge hopper, discharge chute, etc., so as to remove the sludge and concrete attached to the vehicle body. On the way back to the mixing plant, 150-200 liters of water should be poured into the mixing tank to clean the concrete residue on the tank walls and blades.
6.日常操作完成后,驅(qū)動程序?qū)⑶逅谷胱詣酉蚯盎旌掀鞯幕旌贤爸校愿咚伲?4-18 rpm)旋轉(zhuǎn)5-10分鐘,然后排干并清潔感光鼓的內(nèi)部。確保用高壓水清潔混合桶的所有部件時,應注意避免出現(xiàn)外觀和操縱桿。增壓水噴嘴與車身涂料外部之間的距離必須少為40厘米。
6. After the daily operation, the driver will pour the clean water into the mixing barrel of the automatic forward mixer, rotate at high speed (14-18 RPM) for 5-10 minutes, and then drain and clean the inside of the drum. Make sure that when cleaning all parts of the mixing drum with high pressure water, care should be taken to avoid appearance and control lever. The distance between the pressurized water nozzle and the exterior of the body paint must be at least 40 cm.
提高多功能混凝土攪拌機軌道效率的方法你明白了嗎?如您想要了解更多內(nèi)容請點擊混凝土攪拌機廠家直銷官網(wǎng)。
Do you understand the way to improve the track efficiency of multifunctional concrete mixer? If you want to know more, please click the official website of concrete mixer manufacturer.

截屏,微信識別二維碼